Action to fix long-running Cooden Sea Road leak welcomed

By
2 Min Read

A LONG-RUNNING water leak on Cooden Sea Road is being tackled, with Clancy engineers on site today (Thursday) on behalf of South East Water, according to a local Councillor.

Councillor Connor Winter says he has been raising the issue every week since it first arose, alongside numerous local residents who have repeatedly reported the leak, pursuing the matter through multiple channels, including emailing and telephoning South East Water, contacting the company through social media and writing directly to its Chief Executive Officer.

Following discussions with engineers on site and South East Water, Cllr Winter has been advised that Clancy are scheduled to start and complete the works today (24 September).

The leak has already been significantly slowed from the original point of investigation, with engineers expecting it to be stopped today.

The works require a permit because of a nearby gas main, with the necessary precautions being taken.

The footpath will initially be temporarily reinstated to allow the ground to settle, followed by a full reinstatement within seven days.

Cllr Winter said: “It is welcome news to finally see engineers on site and to have confirmation that the leak should be stopped today.

“This has taken far too long, but I have continued to raise it every week and have escalated the matter directly with South East Water, including to the Chief Executive.

“I want to thank residents for their patience and for continuing to report the problem. Today is a positive step forward, and I will continue to monitor the works through to the final reinstatement of the footpath.”

- Next Gen Vehicle Sales - Used Cars in Hailsham -
Share This Article